PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started installing the underground sanitary piping at Room 105 (Servery) Facing North-West (800x600).jpg Backfilled and compacted at Rahway Ave. Facing the Administration Building (800x600).jpg Erecting Derrcik -3 3rd Floor Facing North (800x600).jpg Erecting Derrick -3 (2nd and 3rd Floor) Facing South-East (800x600).jpg Excavation at Rahway Ave. Pic -1 (800x600).jpg Excavation at Rahway Ave. Pic -2 (800x600).jpg Installing underground sanitary piping at Room 105 (Servery) Facing West (800x600).jpg Underground conduit for the Tele-Data at Rahway Ave. (800x600).jpg Building rebar column for Elev. 5,6 (4th Floor) Facing North-West (800x600).jpg
Previous pageNext page Excavation at Rahway Ave. Pic -1 (800x600)
Excavation at Rahway Ave. Pic -1 (800x600)